Commissioning

 

The commissioning process is a complete collaboration of the entire team – including the owner, design and construction professionals – and one that we at Dunlap & Partners Engineers fully embrace.

From the earliest planning efforts all the way to the warranty phase and deferred testing, the commissioning process encompasses thorough documentation and ongoing review to make sure the Owner’s requirements [identified in the Owners Project Requirements (OPR)] are being satisfied in the best manner possible.

Examples of our commissioning assignments includes:

  • Peter Jefferson Place VII – Prerequisite Commissioning 2009
    Charlottesville, VA
  • St. Anne’s Belfield School – Prerequisite Commissioning 2009
    Richmond, VA
  • St. Catherine’s School – Prerequisite Commissioning/LEED 2009
    Richmond, VA
  • Old Rockbridge County Courthouse – Prerequisite Commissioning 2009
    Rockbridge, VA
  • St. Christopher’s School – Energy Modeling
    Richmond, VA
  • Siegel Center Ice Storage System, Virginia Commonwealth University (VCU) – Prerequisite Commissioning 2008
    Richmond, VA
  • Hindu Center of Virginia – Prerequisite Commissioning/Energy Modeling
    Richmond, VA
  • MeadWestvaco – Energy Modeling
    Richmond, VA 
  • Prerequisite Commissioning/Energy Modeling 2009-2010
    Chesterfield, VA
  • Henkels & McCoy Office – Prerequisite Commissioning/Energy Modeling 2009-2010
    Blue Bell, PA
  • Cooper Vineyards
    Louisa, Virginia
  • University of Richmond, Weinstein Center/Lakeview Dormitory – Energy Modeling
    Richmond, VA
  • Virginia Commonwealth University (VCU) School of Dentistry – Energy Modeling
    Richmond, VA
  • Wakefield High School – Energy Modeling Arlington, VA
  • Petersburg Library – Energy Modeling
    Petersburg, VA

For more information on the Commissioning Process, LEED Accreditation and how we could utilize this approach for your own project, please email or call us at 804.358.9200.